Offshore Wind Balance of Plant
Balance-of-plant steel and secondary structures fabricated, inspected and shipped to an offshore wind site.
The package covered secondary steel, access platforms and sea-fastening hardware for an offshore wind array, fabricated in Asia and shipped to a North Sea assembly port.
Detailing was agreed with the fabrication shop and the installation contractor before release, so lifting points, tolerances and stowage matched the vessel spread rather than only the drawing set.
Hold points sat at fit-up, weld completion and coating, with third-party inspection released before each shipment left the yard. Sea-fastening and stowage plans were prepared with the transport contractor so discharge sequence followed the installation slots.
On site, the structures were handed over with as-built records and coating reports, ready for the installation contractor's lifting plan.
This reference is illustrative. Confirmed scope, client approval and completion records are provided during formal prequalification.
All ProjectsTell us what the site needs.
Share the scope, location and schedule. We will come back with a delivery approach and the interfaces we would own.