CNOOD ASIA LIMITED

EPC, logistics, trading, engineering design, energy and chemicals.

Industrial piping and pressure vessels inside a process plant

Capabilities across the full delivery cycle

Five disciplines that can be contracted separately or held together under one schedule, one set of documents and one point of accountability.

Heavy lift crane placing a steel module on an offshore platform

Service 01

EPC Contracting

A single contract covering design, procurement, fabrication and site works, with one interface for the owner.

  • Owner requirement and interface clarification
  • Multi-discipline design coordination
  • Procurement, inspection and logistics planning
  • Site construction and commissioning support
Request a Quote
Container ship berthed at a cargo terminal under gantry cranes

Service 02

International Logistics

Heavy-lift scheduling, multimodal routing and customs clearance planned against the site sequence.

  • Route survey, ground bearing and lifting studies
  • Chartering and multimodal booking
  • Export documentation and customs clearance
  • Delivery sequencing to site
Request a Quote
Large diameter steel pipes stacked in a storage yard

Service 03

Trading & Procurement

Sourcing and vendor qualification for steel, piping and equipment, with inspection before release.

  • Vendor qualification and bid evaluation
  • Mill certificates and material traceability
  • Third-party inspection and release
  • Consolidation and shipping readiness
Request a Quote
Engineers reviewing technical drawings and models in an office

Service 04

Engineering Design

Structural, piping and layout design detailed for the fabrication shop and the site, not only the drawing.

  • Concept and detailed design
  • Structural and piping modelling
  • Fabrication-friendly detailing
  • Design review and change control
Request a Quote
Refinery piping racks and process units in an industrial plant

Service 05

Energy & Chemicals

Piping systems, process modules and plant structures for oil, gas and chemical facilities.

  • Piping spools and supports
  • Process modules and skids
  • Tanks, vessels and structures
  • Turnaround and maintenance support
Request a Quote

Why one team

Fewer interfaces, fewer reasons for delay.

One interface

A single contract instead of multiple vendor handoffs.

Design aligned to fabrication

Detailing reviewed with the shop before release.

Project cargo discipline

Lift studies and routing planned with the schedule.

Remote site experience

Sequencing built around access, storage and labour limits.

Quality and safety control

Inspection and HSE procedures applied through delivery.

Compliance and documentation

Export and trade review before goods move.

Delivery process

Seven steps from requirement to handover.

  1. 01

    Requirement review

    Scope, interfaces and site constraints clarified with the owner.

  2. 02

    Scheme and pricing

    Delivery approach, sequence and commercial basis agreed.

  3. 03

    Engineering and procurement

    Design frozen, vendors qualified, long-lead items released.

  4. 04

    Fabrication and inspection

    Shop production with hold points and third-party inspection.

  5. 05

    Logistics and clearance

    Heavy-lift routing, export papers and customs handled.

  6. 06

    Site construction

    Erection sequenced to site access and lifting capacity.

  7. 07

    Commissioning and handover

    Systems tested, documentation closed out, site handed over.

Scope unclear? Start with the requirement.

Send the project location, the packages you are trying to place and the date that matters. We will map them to a delivery approach.

沪ICP备09056912号-2