Designing steel for the site, not the drawing
Fabrication-friendly detailing reduces field rework when access and lifting capacity are limited.

Drawings are usually produced for approval. Fabrication and erection need them to answer a different question: can this be built, lifted and bolted in the space available?
Approval drawings are not buildable drawings
Detailing for the site means checking access for welders, lifting points that match the available crane, and tolerances that can be achieved with the bolting method specified.
Constraints worth checking
On remote sites, the cost of a field modification is not only labour. It is scaffolding, permits, supervision and a delay to the following trade.
Field changes cost more
Reviewing the detail against site conditions before release is cheaper than discovering the constraint after the first lift.
Published as a general delivery note. Project-specific documents are released only through formal enquiry.