Heavy-lift planning starts long before the vessel arrives

2 min read

Route surveys, ground bearing and lift sequencing decide whether a module moves on schedule.

Heavy lift crane raising a prefabricated steel module

Heavy-lift planning usually starts with a question the schedule cannot answer late: can the load reach the crane, and can the crane reach the load?

Start with site access

Route surveys establish ground bearing, overhead clearance and turning radii. Where ground is uncertain, load spreading and temporary works are priced into the plan rather than discovered on the day.

Sequence beats speed

Lift sequencing then ties the transport plan to the installation plan. A module that arrives two weeks early is not early - it is storage, preservation and double handling.

Weather and permits

Weather windows, permits and port access sit on the same timeline. The projects that move smoothly are the ones where these were agreed before the vessel was booked.

Published as a general delivery note. Project-specific documents are released only through formal enquiry.

All Notes

Want these notes applied to your project?

Share the package and the constraints. We will walk through the planning assumptions that matter for your site.

沪ICP备09056912号-2